Portfolio
Case Study 1: Womens Refuge, Elesmere Port
Client: Wirral Housing Association
Specification: Green Roof
Date: August 2005
Time Frame: 3 weeks
Building type: Residential, New Build
Size: 440m2
System:
Marine ply board decking was installed throughout the area and covered with a fully adhered 'Firestone' EPDM rubber membrane.
The 'Flordepot' green roofing system was then applied, this consisted of a build up of Geofabric fleece, nutifoam mats,
extensive soil substrate and sedum plants.
See images from this project
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Case Study 2: Flat Roof Blocks Preston
Client: Preston City Council
Specification: Flat Roof
Date: July 2005
Time Frame: 3 weeks
Building type: Residential, Refurbishment
Size: 570m2
System:
After cleaning off the existing roof we assessed the damaged areas and replaced the substrate where required.
A 'Firestone' EPDM rubber membrane, fully adhered system was applied to the whole area.
See
images from this project
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Case Study 3: Moornook Housing Scheme, Preston
Client: Preston City Council
Specification: Tiled/Slated Refurbishment
Date: September 2005
Time Frame: Approx 1 week per house, scheme ongoing
Building type: Residential, Refurbishment
Size: Various
System:
McLaw Roofing Ltd have been asked to assess a number of properties in the
Preston area and strip off the existing roofs, replace damaged battens,
re-felt and re-slate or re-tile as appropriate. Each property is unique
making for
interesting work,
which includes sourcing the appropriate materials in keeping with the theme
throughout the area.
Images for this project currently
unavailable
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Case Study 4: Market Hall Shopping Centre, Rhyll, Phase 1 & 2
Client: Plant Construction Ltd
Specification: Combination Sheeting, Cladding and flat roof
Date: September 2005
Time Frame: Site visits spanned 12 weeks, work undertaken 4 weeks
Building type: Commercial Unit and shop, refurbishment
Size: 513 m2
System:
. Supply and install 'Firetone' EPDM rubber membrane to flat roof area
. Supply and install insulation
. Supply and install support system, fix new roofing sheets
. Supply and fix ridge and verge detail and all flashing work to suit.
Images for this project currently